Clinic
The following photos are a chronological documentation of the clinic construction...
|
|
107 N. Broadway, Tecumseh, OK.
|
|
The west treatment room doorway on the corner.
|
|
Also in the west treatment room - a partially vaulted ceiling with window to let in a little light.
|
|
Framing of bathroom and two treatment rooms complete, 5/25/06.
|
|
LeAnne's father-in-law Lee Tate has been tearing out lots of good material from the Mable Page house in Tecumseh.
|
|
Dane begins laying the oak flooring.
|
|
Lee cuts flooring.
|
|
LeAnne applies wood filler to the floor.
|
|
The finished bathroom floor.
|
|
The west treatment room taking shape.
|
|
Lee works on the upper window in the west treatment room.
|
|
Finished shelves built into the wall of the west treatment room, 9/30/06.
|
|
Items in the west treatment room. Also, dust on the camera lens.
|
|
Dane installing one of the old windows from the Mable Page house, 10/26/06.
|
|
Here is the front outside of the west treatment room almost finished, 10/26/06.
|
|
The north side of the room is shaping up quickly.
|
|
11/28/06, The front of the office features a clock tower, seen here after an initial coat of paint.
|
|
The office door, still without casing, is a goodie from the Mabel Page house. Above, one of two pendant lights in the hallway.
|
|
12/4/06, The clock has been installed in the clock tower and the trim attached. The office window and counter are also in.
|
|
1/6/07, A new park bench compliments the city street motif.
|
|
This is LeAnne's hallway sink.
|
|
The fountain.
|
|
1/16/07, The new sign being carved out of a piece of solid pine.
|
|
1/23/07, The new sign is finished and hanging up over the front door.
|
|
9/4/07, The room signs are now in place. This one is for the East treatment room. The brackets were made by our friend Mark, a metalsmith in Manchester, England.
|