Clinic
The following photos are a chronological documentation of the clinic construction...
107 N. Broadway, Tecumseh, OK.
The west treatment room doorway on the corner.
Also in the west treatment room - a partially vaulted ceiling with window to let in a little light.
Framing of bathroom and two treatment rooms complete, 5/25/06.
LeAnne's father-in-law Lee Tate has been tearing out lots of good material from the Mable Page house in Tecumseh.
Dane begins laying the oak flooring.
Lee cuts flooring.
LeAnne applies wood filler to the floor.
The finished bathroom floor.
The west treatment room taking shape.
Lee works on the upper window in the west treatment room.
Finished shelves built into the wall of the west treatment room, 9/30/06.
Items in the west treatment room. Also, dust on the camera lens.
Dane installing one of the old windows from the Mable Page house, 10/26/06.
Here is the front outside of the west treatment room almost finished, 10/26/06.
The north side of the room is shaping up quickly.
11/28/06, The front of the office features a clock tower, seen here after an initial coat of paint.
The office door, still without casing, is a goodie from the Mabel Page house. Above, one of two pendant lights in the hallway.
12/4/06, The clock has been installed in the clock tower and the trim attached. The office window and counter are also in.
1/6/07, A new park bench compliments the city street motif.
This is LeAnne's hallway sink.
The fountain.
1/16/07, The new sign being carved out of a piece of solid pine.
1/23/07, The new sign is finished and hanging up over the front door.
9/4/07, The room signs are now in place. This one is for the East treatment room. The brackets were made by our friend Mark, a metalsmith in Manchester, England.